Temprox is the commercial engineering division of a Foshan stainless steel manufacturer founded in 2009. We supply wine cellars, bar workstations, display cases and dry-aging rooms to hotels, restaurants, retail groups and developers across Europe — 3,800 m² of workshop, 42 engineers and project staff, 17 years of export documentation.
Our work starts before metal is cut. Submittal drawings, thermal calculations, condensation risk, door pressure against room volume, service clearances and redundancy are resolved on paper first. That is why our units survive a third-party commissioning agent — and why we are comfortable being audited.
We are not the cheapest quote in a tender. We are the one that does not generate a snag list at handover.
Capabilities
Design & documentation
Submittal drawing sets, BIM models, thermal load calculations, electrical schematics and weld maps issued within 48 hours of a complete brief.
Thermal engineering
Thermal-break frame profiles, heated anti-fog glazing, condensate management designed before it can form, and redundant condensing for high-traffic venues.
Fabrication
SUS304/SUS316 heavy-gauge fabrication, seamless TIG welding on visible joints, HACCP-compatible contact surfaces, EN 1090 structural compliance.
Commissioning & handover
Pressure-decay testing, 72-hour pull-down records, hinge cycle verification to 500,000 cycles, and an O&M manual written for the facilities team that inherits the room.
Culture
Four clauses that decide what we accept and what we refuse. They cost us work every year; they are also why clients come back.
01
No record, no acceptance
If a test was not written down, it did not happen. Every unit ships with four documents: submittal set, weld map, pressure/thermal log, O&M manual.
02
Design for the service corridor
Restaurant cellars are maintained from behind, at 1 a.m., by someone with a torch. Six hundred millimetres of clearance is not a luxury; it is the difference between a maintained unit and an abandoned one.
03
Compliance is the floor
EN 1090, EN 60335, HACCP, laminated security glazing where stock value demands it — these are entry requirements, not selling points. The ceiling is a unit nobody can fault.
04
Say the uncomfortable number early
If a ceiling height will not hold the door swing, or a plant room cannot reject the heat, we put it in writing in week one — not in a variation order in week nine.
Quality
How compliance is demonstrated
—Structural calculations and material certificates issued with the submittal package.
—Pressure-decay and thermal pull-down records retained for seven years and available to the client's FM team.
—Factory acceptance testing can be witnessed on site in Foshan or by live video with instrument readings on screen.
—Component traceability: compressor, controller, glazing and locking hardware recorded by batch per unit.
Clients
Hotel & restaurant groups
Multi-unit rollouts with a single specification, phased delivery aligned to fit-out programmes.
Developers & retail
BIM-coordinated packages for mixed-use schemes, with handover documentation for facility management.
Consultants & main contractors
Submittal-ready documentation, witnessed testing and a named project engineer for the duration.